
Air Compressor Pneumatic Automatic Drain
Applicable medium: various compressed gases
Operating temperature: 0-80℃
Working pressure: 0-16Bar
| Working Pressure | 0-16Bar |
| Working Medium | various compressed gases |
| Working Temperature | 0-80℃ |
| Port Size | 1/2PT |
| 24 hours automatic drainage | |

1. When installing, press the arrow to confirm the direction of the inlet and outlet, and the drain body must be kept in a vertical direction
2. If the water volume is particularly large, turn the regulating valve counterclockwise to increase the water volume, and tighten the nut after adjustment
3. If there is no drainage, turn the regulating valve counterclockwise to let the air pressure flush out the dirt and then tighten the regulating valve.
4. If the environment is too dirty, the filter needs to be cleaned regularly. Steps to clean the filter:
1) First close the air inlet valve and confirm that there is no pressure inside
2) Twist the upper cover, take out the filter screen of the upper cover for cleaning, and lock the upper cover when reinstalling it
3) Twist the lower cover, take out the filter screen of the lower cover, clean it, and then put it back in sequence
5. The drain port is connected to the outer diameter 8 to guide the sewage pipe, or the drain port connector can be removed and the 1/2 pipe can be used to enter the sewage system

Supplier's Popular Products:


FAQ:
Q1:Do you have MOQ?
A1:1 Piece
Q2:How long about delivery time
A2:Depend on quantity
Q3:Transport
A3:By sea,by air,by international express etc.
Hot Tags: air compressor pneumatic automatic drain, China, manufacturers, suppliers, factory, customized, low price, made in China
Send Inquiry








