How to make the precision pressure reducing valve longer? What should be paid attention to when using?
Jan 19, 2020
How to make the precise pressure reducing valve longer? What should be paid attention to when using?
The installation and maintenance of precision pressure reducing valve should pay attention to the following items:
1. Hand wheel, handle and transmission mechanism are not allowed to be used for lifting, and collision is strictly prohibited.
2. The double gate valve shall be installed vertically (i.e. the valve rod is in the vertical position and the hand wheel is at the top).
3. The gate valve with bypass valve shall be opened before opening (to balance the pressure difference between the inlet and outlet and reduce the opening force).
4. The gate valve with transmission mechanism shall be installed according to the provisions of the product operation manual.
5. If the valve is used frequently, lubricate it at least once a month.
The above is the installation and use of precision pressure reducing valve, hope to help you!






